How to use the concrete calculator
- Pick the shape: a slab, footing or wall; a round post hole or column; or a set of steps.
- Enter the dimensions in any mix of inches, feet, yards, meters or centimeters, and how many you're pouring.
- Read the result in cubic yards, cubic feet and cubic meters, plus the number of 40, 60 and 80 lb bags and an optional cost.
Concrete volume formulas
Round hole or column: V = π × (diameter ÷ 2)² × depth
Steps (solid): V = width × rise × run × n(n + 1) ÷ 2
Cubic yards = cubic feet ÷ 27 · Bags = cubic feet ÷ bag yield
Worked examples
A 10 × 10 ft patio, 4 inches thick
80 lb bags: 35.0 ÷ 0.60 = 58.3 → 59 bags · 60 lb: 78 · 40 lb: 117
Four 12-inch round columns, 4 ft tall
Each is π × 0.5² × 4 = 3.14 ft³, so four take 12.6 ft³ (0.47 yd³) before extra, about 21 bags of 80 lb.
Four steps, 7 in rise, 11 in run, 4 ft wide
Solid steps stack: the bottom step is one rise high, the top one four rises high. 4 × (7/12) × (11/12) × (4 × 5 ÷ 2) = 21.4 ft³, or 0.79 yd³.
Bags per cubic yard
| Bag size | Yield per bag | Bags per cubic yard |
|---|---|---|
| 40 lb | 0.30 ft³ | 90 |
| 60 lb | 0.45 ft³ | 60 |
| 80 lb | 0.60 ft³ | 45 |
Yields are from the Quikrete Concrete Mix (No. 1101) data sheet. Other brands and high-strength or fast-setting mixes can differ slightly, so check the bag.
Typical thicknesses
| Project | Common thickness | Yd³ per 100 sq ft |
|---|---|---|
| Walkway, patio, shed base | 4 in | 1.23 |
| Driveway, garage floor | 5–6 in | 1.54 – 1.85 |
| Footing (varies by code and load) | 8–12 in | 2.47 – 3.70 |
Before and after the pour
- Gravel base: slabs usually sit on a few inches of compacted gravel. Estimate it in tons with the gravel and stone calculator.
- Digging out: work out the soil to remove with the cubic yard calculator.
- Odd shapes: measure the area first with the square footage calculator, then multiply by the thickness. For round forms and tubes, the cylinder volume calculator gives gallons and liters too.
Tips
- Measure the forms, not the plan: actual depth often varies, so check the thickness in several spots.
- Order a little extra: running out mid-pour leaves a weak joint.
- Cure slowly: keeping new concrete damp for the first several days helps it reach full strength.
Estimates only. Follow local building codes and the manufacturer's instructions. More home and construction calculators.
Sources
Frequently asked questions
How do I calculate how much concrete I need?
Multiply length × width × thickness, all in feet, to get cubic feet, then divide by 27 for cubic yards. A 10 × 10 ft slab 4 inches thick is 10 × 10 × 0.333 = 33.3 ft³, or 1.23 yd³. Add 5–10% for spillage and an uneven base.
How many bags of concrete are in a yard?
One cubic yard is 27 cubic feet. With Quikrete Concrete Mix yields of 0.60 ft³ per 80 lb bag, 0.45 ft³ per 60 lb bag and 0.30 ft³ per 40 lb bag, that's 45 bags of 80 lb, 60 bags of 60 lb or 90 bags of 40 lb.
How thick should a concrete slab be?
Patios, walkways and shed bases are commonly 4 inches thick. Driveways and slabs that carry vehicles are often 5–6 inches, sometimes with reinforcement. Local building codes and the load set the requirement.
How much concrete do I need for a fence post?
Work out the volume of the hole (π × radius² × depth) and subtract the post if you want to be exact. A 10-inch hole 3 feet deep is about 1.64 ft³, roughly 3 bags of 80 lb concrete before subtracting the post; a 4 × 4 post 3 ft deep takes up about 0.26 ft³ of that.
Should I use bags or ready-mix?
Bags make sense for small jobs like posts, steps or a small pad. Beyond about a cubic yard (45 bags of 80 lb), mixing by hand becomes hard work and ready-mix delivery is usually more practical, although many suppliers have a minimum order or short-load fee.
What's the difference between cement and concrete?
Cement is the powder (usually Portland cement) that binds everything together. Concrete is cement mixed with sand, gravel and water. Bagged concrete mix already contains all the dry ingredients; you just add water.
How much extra concrete should I order?
Add about 5–10%. Forms bow, bases are rarely perfectly level and some concrete is always lost. Running short mid-pour leaves a weak cold joint, so it's better to have a little left over.