How to use the epoxy resin calculator
- Choose a rectangular or round surface and enter its size.
- Enter the pour depth (1/8 in = 0.125 in for a typical flood coat) and, for river tables or inlays, the share of the area that gets epoxy.
- Pick your product's mix ratio and the extra to allow, plus kit size if you're buying kits.
Epoxy volume formula
US fl oz = inยณ รท 1.805 ยท Gallons = inยณ รท 231 ยท mL = inยณ ร 16.387
Resin = total ร A รท (A + B) ยท Hardener = total ร B รท (A + B)
Worked example: 48 ร 24 in table top
At 1/8 in: 48 ร 24 ร 0.125 = 144 inยณ = 79.8 fl oz. With 10% extra: 87.8 fl oz (0.69 gallons, 2.6 liters). At a 1:1 ratio that's about 43.9 fl oz each of resin and hardener.
Epoxy per square foot by depth
| Depth | fl oz per sq ft | sq ft per gallon |
|---|---|---|
| 1/16 in | 5.0 | 25.7 |
| 1/8 in | 10.0 | 12.8 |
| 1/4 in | 19.9 | 6.4 |
| 1/2 in | 39.9 | 3.2 |
| 1 in | 79.8 | 1.6 |
Pouring tips
- Seal coat first on wood so air bubbles don't rise into the flood coat.
- Measure precisely and mix for the time on the label, scraping the sides and bottom of the cup.
- Work warm: most epoxies cure best around room temperature; cold epoxy is thick and bubbly.
Odd-shaped molds? Find their volume with the volume calculator. Price the slab with the board foot calculator, or tile a surface instead with the tile calculator. More home and construction calculators.
Sources
Frequently asked questions
How much epoxy do I need per square foot?
At a 1/8 in (3 mm) flood coat, one square foot needs 144 ร 0.125 = 18 cubic inches, about 10 US fl oz of mixed epoxy. Coverage charts from epoxy makers list similar figures (roughly 9.6โ10.7 fl oz per sq ft at 1/8 in). Double the depth and you double the epoxy.
How do I calculate epoxy for a table top?
Multiply length ร width ร depth in inches to get cubic inches, divide by 1.805 for fluid ounces (or by 231 for gallons), then add about 10% for spills and drips off the edges. A 48 ร 24 in top at 1/8 in needs about 80 fl oz, or 88 fl oz with 10% extra.
How much epoxy does a river table need?
Estimate the share of the table the river covers and multiply by the slab area and thickness. A 1.5 in thick, 72 ร 36 in table with a river over 25% of the area needs about 972 cubic inches, roughly 4.2 gallons before extra. Use a deep-pour epoxy rated for that thickness.
How do I split resin and hardener?
Divide the total by the parts in the ratio. For 88 fl oz at 1:1, mix 44 fl oz of each; at 2:1, about 58.7 fl oz resin and 29.3 fl oz hardener. Check whether your product's ratio is by volume or by weight.
How thick can I pour epoxy in one layer?
It depends on the product. Table-top (coating) epoxies are usually poured in thin layers around 1/8 in, while deep-pour casting resins are designed for much thicker pours. Exceeding the maximum depth can overheat the epoxy and cause cracking or yellowing.
How much extra epoxy should I mix?
About 10% covers what clings to cups and drips off the edges. Add more for porous wood that soaks up a seal coat, or for live edges and voids.